Capacity Tracker
Tracking peptide manufacturing and upstream raw-material capacity projects worldwide.
Includes 1 peptide-development group. Groups are projects or platforms, not individual factories.
Showing 29 of 29 groups
| Company | Location / project | Capacity / capability | Status | Expected milestone | Supply Model |
|---|---|---|---|---|---|
| Suzhou Highfine BiotechUpstream raw materialsSource ↗ | Huai'an phase-one reagent manufacturing project, JiangsuChina | 5130 tonnes/year (planned design)Upstream materialsQualificationsExpected milestone: Q4 2026–Q1 2027 — first five workshops' trial production (company guidance) Project-level construction; trial production, commercial production and product-line readiness are not confirmed. Review 2026-10-09: Trial guidance remains Q4 2026–Q1 2027 for first five workshops; no product mapping or commercial production confirmation. Whole phase-one total. Includes 290 tonnes/year protected amino acids, 2,500 coupling reagents and 800 protection reagents. Components are subsets, not additional projects or quantities. August 25 guidance is subject to construction progress. Window covers the first five of ten workshops, without product allocation; full-project startup unresolved. | Under Construction | Q4 2026–Q1 2027 | UndeterminedAvailability: Undisclosed |
| Neuland LaboratoriesPeptide APIsSource ↗ | Bonthapally, Telangana — Module One and proposed Module TwoIndia | 7000 L (combined reactor volume)API synthesisQualificationsModule One reported operational September 15, 2026; utilization and customer-specific qualification undisclosed. Module Two remains proposed. Review 2026-10-09: Recovered company original: Module One operational at 7,000 L. Earlier 6,370 L unreconciled. Module Two up to 18,000 L remains proposed with no startup date. Module One: 750 L SPPS + 6,250 L LPPS. Earlier 6,370 L specification remains unreconciled. Module Two up to 18,000 L is prospective, not additional operating capacity. Reactor volume is not annual API output. Module Two startup undisclosed. Engineered >100 kg/year claim has unresolved module/scope and is not treated as demonstrated output. | Operating / Commissioned | Not established | CDMOAvailability: Undisclosed |
| Blue Jet HealthcareUpstream raw materialsSource ↗ | Vizag / Visakhapatnam — mixed-use manufacturing projectIndia | Not disclosedUpstream materialsQualificationsCompany reported engineering/preconstruction and consent to establish; peptide commissioning unverified. Review 2026-10-09: Site groundbreaking does not prove peptide-fragment construction or commissioning. Preserve planned peptide status. Peptide fragments/intermediates prioritized; peptide-specific capacity undisclosed. Mixed-project investment is not peptide capacity. August 3 management guidance concerns prospective commercialization around end-FY2029–FY2030, not a verified commissioning date. | Announced / Planned | Not established | UndeterminedAvailability: Undisclosed |
| Anthem BiosciencesPeptide APIsSource ↗ | Unit IV, Harohalli, KarnatakaIndia | Not disclosedAPI synthesisQualificationsCompany website reports construction; its publication date is undisclosed. Peptide-specific capacity undisclosed. Separately commissioned Unit III and its 16 kL disclosure are excluded from this entry. | Under Construction | Not established | CDMOAvailability: Undisclosed |
| CordenPharmaPeptide developmentSource ↗ | Flatiron Park, Boulder, Colorado — development laboratoryUS | 64000 sq ft (laboratory floor area)API synthesisQualificationsLaboratory expansion announced; operations not verified. Supporting peptide development space, not commercial API manufacturing volume or annual output. | Announced / Planned | Not established | CDMOAvailability: Undisclosed |
| Lupin Manufacturing SolutionsUpstream raw materialsSource ↗ | Dabhasa, Gujarat — peptide building-block expansionIndia | Not disclosedUpstream materialsQualificationsExpansion announced; commissioning not verified. Review 2026-10-09: Protected amino-acid expansion remains relevant; latest report supplies no quantitative product capacity or verified startup. Protected-amino-acid capacity not quantified. | Announced / Planned | Not established | UndeterminedAvailability: Undisclosed |
| CordenPharma / AmbioPharmPeptide APIsSource ↗ | North Augusta, South Carolina — former AmbioPharm expansionUS | 68000 sq ft (expansion floor area)API synthesisQualificationsExpected milestone: Early 2028 — company editorial indexed text; full-page confirmation pending September 22 company groundbreaking; commissioning unverified. Acquisition completed in August and adds no new physical capacity. Review 2026-10-09: September 28 company editorial indexed text gives early-2028 go-live, later than June end-2027. Full-page access failed: qualified timing update only. Preserve USD118.96m / USD121.9m and later >USD200m scope differences; same 68,000 sq ft project and acquisition history. One expansion originated by AmbioPharm. Floor area is not peptide output capacity. Investment disclosures have unresolved scope/budget differences. June 16 state guidance; meaning of online is unspecified and was not reconfirmed in September. No exact startup date established. Earlier end-2027 guidance preserved as history; no exact commercial-production date. | Under Construction | Early 2028 | CDMOAvailability: Undisclosed |
| BachemPeptide APIsSource ↗ | Building K, BubendorfSwitzerland | Not disclosedMixedQualificationsCompany reports commercial GMP manufacturing and ramp-up; full utilization not established. Review 2026-10-09: July company update confirms commercial GMP manufacturing/ramp; April inauguration is a separate milestone. Peptide-only quantitative capacity undisclosed. | Operating / Commissioned | Not established | CDMOAvailability: Undisclosed |
| Chengdu Shengnuo BiologicalPeptide APIsSource ↗ | Dayi County, Sichuan — GLP-1 API industrialization projectChina | Not disclosedAPI synthesisQualificationsCompany-reported construction; project commissioning and final permitting unverified. June EIA describes 10 tonnes/year added after completion; October 2025 announcement describes >10 tonnes/year total with existing lines. Scope unresolved; neither is operating output. Other ramping workshops are not this project. | Under Construction | Not established | CDMOAvailability: Undisclosed |
| Nantong Changyou Pharmaceutical TechnologyPeptide APIsSource ↗ | Rudong / Nantong — semaglutide and tirzepatide projectChina | 140 kg/year (planned peptide-drug output)API synthesisQualificationsConstruction/retrofit reported; commissioning and API-grade scope unverified. 120 kg/year semaglutide + 20 kg/year tirzepatide, planned. Non-peptide environmental acceptance does not establish peptide commissioning. Historical May–July 2026 construction timetable is not a startup date. No peptide startup verified through October 7. | Under Construction | Not established | UndeterminedAvailability: Undisclosed |
| Medtide / Chinese Peptide Company / CPC ScientificPeptide APIsSource ↗ | Qiantang, Hangzhou — existing peptide API expansionChina | Several tonnes/year (company capacity claim)MixedQualificationsCompany manufacturing section reports commissioned as of June 30; introductory equipment-commissioning wording conflicts. Review 2026-10-09: Qiantang commissioned as of June 30 per September filing; actual output unquantified. Rocklin end-2026 up-to-300 kg/year target and new Qiantang phase-I property project are separate proposals. Several tonnes/year is unquantified and not actual output. Up to 100 kg/batch is a separate capability. 3,000 L reactors are individual equipment scale, not a summed site volume. Rocklin and the separate proposed Qiantang phase I are excluded. | Operating / Commissioned | Not established | CDMOAvailability: Undisclosed |
| BachemPeptide APIsSource ↗ | Sisslerfeld / Eiken — planned first manufacturing phaseSwitzerland | Not disclosedAPI synthesisQualificationsExpected milestone: 2030 — company production-start guidance Planned strategic collaboration; construction/operation not confirmed. Review 2026-10-09: Sisslerfeld customer-backed first-phase production target 2030; no annual output quantity. Peptide-specific quantitative capacity undisclosed; investment is not output. Company expectation, not a guaranteed or exact commissioning date. | Announced / Planned | 2030 | CDMOAvailability: Customer-committed |
| HRV Pharma / Arene LifesciencesPeptide APIsSource ↗ | India — dedicated Arene partner manufacturing arrangementIndia | Not disclosedAPI synthesisQualificationsDedicated arrangement announced; completed scale-up and operating output unverified. Arene owns/operates the capacity; it is not directly owned HRV capacity. Peptide-specific quantity and precise site unresolved. Earlier March–May 2027 estimate remains unconfirmed; no verified startup date. | Announced / Planned | Not established | UndeterminedAvailability: Customer-committed |
| Shilpa Medicare / Shilpa CDMOPeptide APIsSource ↗ | India — Shilpa CDMO peptide manufacturing platformIndia | Not disclosedAPI synthesisQualificationsManufacturing details pending; no verified peptide commissioning milestone by October 7. Peptide-specific quantitative capacity undisclosed. Broader small-molecule 230 kL is excluded. CPHI publicity promised further details; this is not a verified plant startup date. | Announced / Planned | Not established | CDMOAvailability: Undisclosed |
| Changzhou Pharmaceutical Factory / 常州制药厂有限公司Peptide APIsSource ↗ | Tianning Economic Development Zone, Changzhou, JiangsuChina | 380 kg/year (planned API capacity)API synthesisQualificationsEnvironmental approval received; commissioning/operation unverified. 280 kg/year fermentation-route semaglutide, 60 SPPS semaglutide, 40 tirzepatide. Tirzepatide route unresolved. Prospective capacity, not demonstrated output. Startup depends on completion and operation of external industrial wastewater infrastructure; no date established. | Announced / Planned | Not established | UndeterminedAvailability: Undisclosed |
| Sinopep / Jiangsu Sinopep-Allsino BiopharmaceuticalPeptide APIsSource ↗ | Lianyungang, Jiangsu — existing workshops 601/602China | 5779 kg/year (annual design capacity)API synthesisQualificationsOperating project reported by company; design capacity is not actual production or unrestricted merchant availability. Rounded July 5.8-tonne claim and earlier Workshop 601 annual figures remain distinct/unreconciled. Historical 4.7% utilization denominator/period unresolved; no spare-capacity calculation. | Operating / Commissioned | Not established | CDMOAvailability: Undisclosed |
| Sunresin / 西安蓝晓科技新材料股份有限公司Upstream raw materialsSource ↗ | Pucheng, Weinan, Shaanxi — life-sciences manufacturing projectChina | Not disclosedUpstream materialsQualificationsPlanned project; approvals progressing. Construction/operation of peptide supports not verified. Peptide solid-phase synthesis supports/resins included; peptide-specific capacity undisclosed. Whole-park 16,400 tonnes/year and investment are excluded. August resin scale-up is not established as Pucheng production. May 20 company expectation of phased completion/production over approximately two years concerns the park; peptide-line startup undisclosed. | Announced / Planned | Not established | UndeterminedAvailability: Undisclosed |
| Asymchem / 凯莱英Peptide APIsSource ↗ | Aggregate peptide platform / TJ4-linked and Tianjin TIDES projectChina | >45000 L (commissioned reactor volume)MixedQualificationsAggregate baseline commissioned according to company. Separate Tianjin mixed-TIDES investment is under construction, not operational; relationship to baseline unresolved. Review 2026-10-09: Commissioned >45,000 L and separate >22.5 tonnes/year company claim retained; ~69,000 L is future total target reaffirmed August, not an incremental 24,000 L addition. Separate >22.5 tonnes/year capability claim is not actual output or another project. ~69,000 L year-end target is a future total. Tianjin peptide-specific capacity undisclosed. Grouped to prevent overlapping entry/quantity counts. ~69,000 L by end-2026 is a capacity target, not a verified startup date. Tianjin project startup undisclosed. | Operating / Commissioned | Not established | CDMOAvailability: Undisclosed |
| Space Peptides (Taizhou) / 泰州兴普泰生物制药有限公司Peptide APIsSource ↗ | Taixing, Taizhou, Jiangsu — multi-year peptide expansionChina | Not disclosedAPI synthesisQualificationsCompany-announced expansion; new construction commencement unverified. >70,000 L SPPS and >30 tonnes/year are prospective company targets only. Earlier capacity figures/timelines remain unreconciled; target/API-grade scope uncertain. No additive building 2–4 entries. Five-year plan is not an exact commissioning/startup date. | Announced / Planned | Not established | CDMOAvailability: Undisclosed |
| Sichuan Jisheng Biopharmaceutical / 四川吉晟生物医药有限公司Peptide APIsSource ↗ | Phase II Building 2, Leshan High-tech Zone, SichuanChina | Not disclosedAPI synthesisQualificationsLine 3 construction reported in March; later startup remains unverified. Line 4 remains planned, not verified under construction. Reliable line-specific quantitative capacity undisclosed. Conditional full-load/batch claims excluded. API qualification, products and parcel scope unresolved. Line 3 end-April target elapsed without verified startup. Line 4 end-2026 remains company guidance, not an established startup date. | Under Construction | Not established | UndeterminedAvailability: Undisclosed |
| Cambrex / Cambrex Charles City, Inc.Peptide APIsSource ↗ | Charles City, Iowa — planned expansion including LPPSUS | Not disclosedAPI synthesisQualificationsInitial engineering complete; construction commencement unverified through October 7. Commercial-scale liquid-phase peptide manufacturing planned. Broader 140,000 L / USD120m figures are not peptide-specific. Peptide quantity and annual output undisclosed. Late-2026 groundbreaking guidance is not verified commencement or an operational startup date. | Announced / Planned | Not established | CDMOAvailability: Undisclosed |
| Eli LillyPeptide APIsSource ↗ | Lebanon, Indiana — API manufacturing siteUS | Not disclosedMixedQualificationsExpected milestone: 2027 — company target for API-site opening API site target opening 2027. Separate Advanced Therapies site opened May 2026. Investment spans sites and mixed API products; no peptide-specific quantity. Company milestone/target; exact production eligibility or output not inferred. | Under Construction | 2027 | CaptiveAvailability: Captive |
| Eli LillyPeptide APIsSource ↗ | Kinsale — IE2b complex-peptide expansionIreland | Not disclosedAPI synthesisQualificationsExpansion began making medicines in 2023, inaugurated 2024. SPPS fragments plus continuous LPPS; no annual peptide capacity disclosed. Company milestone/target; exact production eligibility or output not inferred. | Operating / Commissioned | Not established | CaptiveAvailability: Captive |
| Novo NordiskPeptide APIsSource ↗ | Kalundborg — 2023 API/packaging expansionDenmark | Not disclosedMixedQualificationsExpected milestone: 2029 — company fully-operational target Multi-product API including GLP-1 plus packaging; expected fully operational 2029. Original >DKK42bn, latest DKK49.6bn whole-project budget, not capacity. Distinct earlier fermentation upgrade not additive. Company milestone/target; exact production eligibility or output not inferred. | Under Construction | 2029 | CaptiveAvailability: Captive |
| WuXi STA / WuXi AppTecPeptide APIsSource ↗ | Company-wide peptide/SPPS platform; Changzhou, Taixing and SingaporeChina / Singapore | >100000 L (aggregate SPPS reactor volume)MixedQualificationsAggregate >100,000 L SPPS at end-2025. Future 130,000 L target undated. Chinese site quantities not allocated; Singapore TIDES Q2 2028 target. Children are not additional public groups. Company milestone/target; exact production eligibility or output not inferred. | Operating / Commissioned | Not established | CDMOAvailability: Undisclosed |
| CordenPharmaPeptide APIsSource ↗ | Colorado — commercial SPPS expansion, BoulderUS | 25000 addition; >42000 future total L (SPPS reactor volume; prospective)API synthesisQualificationsExpected milestone: 2028 — company target 25,000 L disclosed addition; >42,000 L future site total in 2028. Not additive to each other. Separate from CAP-2026-008 development laboratory floor area. Company milestone/target; exact production eligibility or output not inferred. | Under Construction | 2028 | CDMOAvailability: Undisclosed |
| PolyPeptidePeptide APIsSource ↗ | Braine-l’Alleud — large-scale SPPS facilityBelgium | Not disclosedAPI synthesisQualificationsStarted production December 2024; target utilization achieved H1 2026. Contract-backed facility; no inference of spare capacity or annual output. EUR100m investment/order value not physical capacity. Company milestone/target; exact production eligibility or output not inferred. | Operating / Commissioned | Not established | CDMOAvailability: Customer-committed |
| PolyPeptidePeptide APIsSource ↗ | Malmö — SPPS doubling expansionSweden | Not disclosedAPI synthesisQualificationsExpected milestone: 2027 — company ramp target Construction complete; commissioning ongoing as of H1 results. Ramp target 2027. Relative doubling not annual output; supported by customer contract, no exclusivity inferred. Company milestone/target; exact production eligibility or output not inferred. | Commissioning | 2027 | CDMOAvailability: Customer-committed |
| PolyPeptidePeptide APIsSource ↗ | Strasbourg — SPPS expansionFrance | Not disclosedAPI synthesisQualificationsCompany reported expanded SPPS operational by March 12, 2026; H2 2026 ramp target. Relative doubling not annual output; exact startup date undisclosed. Company milestone/target; exact production eligibility or output not inferred. | Operating / Commissioned | Not established | CDMOAvailability: Undisclosed |
29 approved project/platform groups, including one development laboratory. WuXi site milestones remain within one aggregate platform; Highfine components and Asymchem’s overlapping disclosures are not counted as additive projects or capacity. Status reflects supported disclosures, not verified current utilization. Reactor litres, annual capacity claims, batch capability and floor area are different measures and must not be added. Captive and customer-committed capacity is not generally available merchant supply. “Not disclosed” does not mean zero. Commissioning is included under Under Construction in headline counts.
Peptide manufacturing milestones · 2026–2030
Selected manufacturing milestones. Reported achievements and company targets are shown separately; event counts are not additional project counts.
2026
- Company target2026-Q4/2027-Q1
Highfine · Huai’an first five workshops
Trial production expected Q4 2026–Q1 2027, subject to construction progress; no product allocation
Source ↗ · View tracker groupMilestone qualifications
Company target · Window · China · Undetermined
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.
- Reported achieved2026-09-15
Neuland · Module One
Module One reported operational: 7,000 L total reactor volume
Source ↗ · View tracker groupMilestone qualifications
Company-reported achieved · Disclosure date; exact startup undisclosed · India · CDMO
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.
- Reported achieved2026-09-22
CordenPharma / AmbioPharm · North Augusta
Groundbreaking of existing expansion project; acquisition is not capacity addition
Source ↗ · View tracker groupMilestone qualifications
Company-reported achieved · Day; baseline captured source · US · CDMO
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.
- Reported achieved2026-07-30
Bachem · Building K, Bubendorf
Commercial GMP manufacturing underway and ramping by July update; separate April inauguration
Source ↗ · View tracker groupMilestone qualifications
Company-reported achieved · Disclosure by-date · Switzerland · CDMO
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.
- Reported achieved2026-04-14
Asymchem · Aggregate peptide platform
>45,000 L commissioned SPPS disclosed; reporting milestone, not April commissioning date
Source ↗ · View tracker groupMilestone qualifications
Company-reported achieved · Disclosure date · China · CDMO
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.
- Company targetEnd-2026
Asymchem · Aggregate peptide platform
Approximately 69,000 L future total by year-end; no derived increment
Source ↗ · View tracker groupMilestone qualifications
Company target · Year-end · China · CDMO
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.
- Reported achieved2026-06-09
Asymchem · Tianjin TIDES project
Government reports construction commencement; peptide quantity undisclosed
Source ↗ · View tracker groupMilestone qualifications
Government-reported achieved · Day · China · CDMO
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.
- Reported achieved2026-06-30
Medtide · Existing Qiantang
Facility commissioned as of June 30 according to later September filing; actual output not quantified
Source ↗ · View tracker groupMilestone qualifications
Company-reported achieved · As-of date; not exact commissioning date · China · CDMO
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.
- Reported achievedH1 2026
PolyPeptide · Braine-l’Alleud
Target utilization achieved H1 for existing commercial-production facility; not new commissioning
Source ↗ · View tracker groupMilestone qualifications
Company-reported achieved · Half-year · Belgium · CDMO
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.
- Reported achievedH1 2026
PolyPeptide · Malmö expansion
Construction complete; commissioning ongoing as of H1 results
Source ↗ · View tracker groupMilestone qualifications
Company-reported achieved · As-of half-year · Sweden · CDMO
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.
- Reported achieved2026-03-12
PolyPeptide · Strasbourg expansion
SPPS expansion reported operational by March 12; exact startup undisclosed
Source ↗ · View tracker groupMilestone qualifications
Company-reported achieved · Disclosure by-date · France · CDMO
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.
- Company targetH2 2026
PolyPeptide · Strasbourg expansion
Ramp-up target in H2 2026
Source ↗ · View tracker groupMilestone qualifications
Company target · Half-year · France · CDMO
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.
- Company targetEnd-2026
Sichuan Jisheng · Fourth peptide line
End-2026 fourth-line plan; construction/operation not verified
Source ↗ · View tracker groupMilestone qualifications
Company target · Year-end · China · Undetermined
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.
- Company targetLate 2026
Cambrex · Charles City
Late-2026 groundbreaking target; engineering completion is not construction start
Source ↗ · View tracker groupMilestone qualifications
Company target · Late-year guidance · US · CDMO
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.
2027
- Company target2027
Eli Lilly · Lebanon API site
API-site opening target; separate from Advanced Therapies inauguration
Source ↗ · View tracker groupMilestone qualifications
Company target · Year · US · Captive
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.
- Company target2027
WuXi STA · Taixing new TIDES plants
Two new TIDES plants expected operational; peptide allocation undisclosed
Source ↗ · View tracker groupMilestone qualifications
Company target · Year · China · CDMO
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.
- Company target2027
PolyPeptide · Malmö expansion
Expanded facility ramp-up target
Source ↗ · View tracker groupMilestone qualifications
Company target · Year · Sweden · CDMO
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.
2028
- Company targetQ2 2028
WuXi STA · Singapore TIDES
TIDES component target Q2 2028; not general small-molecule 2027 date
Source ↗ · View tracker groupMilestone qualifications
Company target · Quarter · Singapore · CDMO
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.
- Company target2028
CordenPharma · Colorado commercial SPPS
Future >42,000 L site total target, including disclosed 25,000 L addition
Source ↗ · View tracker groupMilestone qualifications
Company target · Year · US · CDMO
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.
2029
- Company target2029
Novo Nordisk · Kalundborg 2023 expansion
Multi-product API/packaging expansion expected fully operational
Source ↗ · View tracker groupMilestone qualifications
Company target · Year · Denmark · Captive
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.
2030
- Company target2030
Bachem · Sisslerfeld first phase
Production target for customer-backed first phase
Source ↗ · View tracker groupMilestone qualifications
Company target · Year · Switzerland · CDMO
Read description and confirmed/target field: site opening, reporting, trial production and ramp milestones are not interchangeable with validated commercial production.